Author Archives: Peter Smith

prefab UNIBUILD

Job 9326. Low cost remote area housing. 9326 Design Overview 9326-FLOOR PLAN 1 9326-FLOOR PLAN 2 9326-FLOOR PLAN 3 DISABLED RAMP 9326-FLOOR PLAN 4 SERVICES 9326-FLOOR PLAN 5 FURNITURE 9326-FLOOR PLAN 6 FOOTINGS 9326-FREIGHT LOADING 1 9326-FREIGHT LOADING 2 9326-PERSPECTIVE … Continue reading

Posted in Uncategorized | Comments Off on prefab UNIBUILD

prefab UNIBUILD

Only one precast mould shape required to manufacture all building components. 01-04 STRUCTURAL COMPONENT RANGE

Posted in Uncategorized | Comments Off on prefab UNIBUILD

Prefab UNIBUILD

The UNIBUILD PREFAB TECHNOLOGY was recently nominated for the 2024 SMART BUILDING INDUSTRY AWARDS 90% of the above precast panel load is weightless thermal insulation. 10% of the load is Unibuild steel fibre concrete applied in thin layers surrounding the … Continue reading

Posted in Uncategorized | Comments Off on Prefab UNIBUILD

SYDNEY BUILD EXPO 2018

Our Sydney Build 2018 exhibition was seen by over 4000 visitors. The Unibuild Technology received two nomination for The Australian Construction Industry Awards in the categories of “Product Innovation” and “Offsite Construction of the Year”. View Unibuild’s Display Left wall. … Continue reading

Posted in Uncategorized | Comments Off on SYDNEY BUILD EXPO 2018

Technical Details of more than 300 Unibuild Off-Site Modular Buildings Now Available For Technology Transfer

  To view all  PLANS go to Unibuild Projects – PRECAST

Posted in Uncategorized | Comments Off on Technical Details of more than 300 Unibuild Off-Site Modular Buildings Now Available For Technology Transfer

The UNIBUILD Bush-Fire Proof Building Technology.

Back in 1952, when I was a school boy in Canberra, Australia, a raging bush-fire swept in from the south west burning all in its path. The fire burned over Red Hill and was eventually stopped at the fence lines … Continue reading

Posted in Latest News | Comments Off on The UNIBUILD Bush-Fire Proof Building Technology.

The Difference between Unibuild “Off Site” Modular and Conventional Construction

The first Unibuild off-site modular home was built in Canberra in 1968. In 1969 we relocated to Perth, Western Australia, and designed and constructed many Unibuild modular masonry buildings requiring the labour of bricklayers. In the early 70’s Western Australia … Continue reading

Posted in Latest News | Comments Off on The Difference between Unibuild “Off Site” Modular and Conventional Construction

Unibuild’s Fire, Flood, Cyclone and other Hazard Proof “Off Site” Modular Building Technology

Read Peter Smith’s address to the 4th Modular and Offsite Building Conference, Perth, 25-26th March, 2013. Continue reading

Posted in Latest News | Comments Off on Unibuild’s Fire, Flood, Cyclone and other Hazard Proof “Off Site” Modular Building Technology